1.0 Purpose : To provide store management instructions for Engineering department as per safety and cGMP requirements.
2.0 Objective : To provide documented procedure of store management instructions for engineering department as per safety and cGMP requirements.
3.0 Scope : This procedure defines instructions for Engineering store management system. The SOP specifies the responsibilities of staff for the various functions outlined here.
4.0 Responsibility :
§ Primary : Officer – Stores
§ Secondary: Stores In charge/ Manager Store.
5.0 Procedure :
· Before raising the indents for material:
Ø Prepare the Bill of Quantity (BOQ) for the each job. Discuss with the contractor / superiors and finalize it.
Ø Consider the physical stock of the quantities already exists / ordered.
· Procedure for indenting the material:
Ø If required, float the inquiry and invite the three quotations.
Ø Prepare cost comparative statements.
Ø Finalize the purchase order after negotiations.
Ø Prepare purchase order and hand over to the party.
· Procedure for Receiving the material:
Ø After getting the intimation, receive the material at the gate house.
Ø Check the material at gate house, as per delivery challan and quality of material i.e. damage, scratches, finishing etc.
Ø Take the required quantity and use for it was indented.
· Procedure for releasing the intermediate payment of ordered material:
Ø After getting the Receiving Report (RR) from store department, check with the original purchase order (PO).
Ø If okay, release the intermediate payment as per terms and condition mentioned in the PO.
· Procedure for releasing the final payment of ordered material:
Ø If party has already completed all the terms and condition under his scope and supply, then fill the certificate for “Final Payment”.
Ø Release the final payment as per PO.