Maintenance of Sifter


1.0    Purpose     : To provide a documented procedure for Planned Preventive Maintenance of
                                Sifter.     
2.0   Objective  :  Preventive Maintenance of Sifter.       
3.0   Scope  :  This SOP is applicable for Planned Preventive Maintenance of Sifter.
4.0    Responsibility  :
·        Primary: Technician Engineering
·        Secondary: Manager Engineering
5.0   Procedure :
·         Safety Precaution:
Ø    Wear the necessary safety appliances during working.
Ø    Wear clean & tidy uniform.
Ø    Wear protective Goggles, hand gloves etc. as per work requirement.
Ø    Wear safety shoes and helmets.
·        Procedure and Schedule :
Sr. No.
CHECK POINTS
PROCEDURE
FREQUENCY
1.
Electrical Parts
Checking and cleaning of Starter and electrical contacts and Repairing / Replacing them if necessary.
6Months
2.
Gear Box.
Checking oil level in Gear box & filling if required.
Replacing the oil in the gear box if required
15 Days
3.
Motor
Greasing and oiling of Motor bearings and other mechanical parts.
6 Months
4.
Nut Bolts and other Fasteners.
Checking and tightening the Nut Bolts and other Fasteners for proper functioning and repairing/replacing if required.
3Months
5.
Manhole and flush bottom Gaskets.
Changing the Gaskets of Manhole and flush bottom or when required.
3Months
6.
DTI Calibration
Checking the efficiency and calibrating the Instrument
12Months