OUT OF SPECIFICATION INVESTIGATION FORM


Format No.:
Initial results of test
Parameter
Limit (Spec. No.)
Actual
Result



Pass/Fail




Pass/Fail
Attachment: First COA with work-sheets

   Phase-I

     Analyst failure
        Ø Is there any Error in calculation?                                                                 Yes/No
Ø Is there any Error in dilution?                                                                       Yes/No
Ø Are appropriate and valid standards and reagents used?                      Yes/No
Ø Is methods followed?                                                                                    Yes/No
Ø Is the test parameters followed?                                                                 Yes/No
Ø Is sample stored appropriately?                                                                  Yes/No
Ø Is the balance used with appropriate accuracy and calibrated? Yes/No
Ø Is the sample Homogenous?                                                                       Yes/No
Ø Is the calibrated instruments/Glassware used?                                         Yes/No
Ø Is the analyst trained and evaluated?                                                          Yes/No
System Failure:
Ø      To check for Power failure                                                                           Yes/No
Ø      Is the system/Instruments are calibrated? (Calibrate again)                    Yes/No
Ø      Is the calibration standard Used is appropriate?                                      Yes/No
Ø      Is there any spillage/contamination in Standard/sample?                        Yes/No
Ø      Is suitable instrument used?                                                                        Yes/No
Ø      Is the instrument parameters set correctly?                                               Yes/No
Ø      Is the Appropriate Equipment Accessories used?                                   Yes/No
Sampling Procedure Failure:
Ø      Is Sample preparation done properly?                                                       Yes/No
Ø      Is sample taken is representative?                                                 Yes/No
Ø      Is sampling plan followed?                                                                           Yes/No
Ø      Are sampling equipments ok?                                                                    Yes/No
Ø      Are environmental conditioned were OK during Sampling?                    Yes/No
Ø      Is Appropriate Sample container / Sample bag Used?                           Yes/No
Other Checks for In-process sampling checks:
Ø      Check if there is change in reaction time.                                      Yes/No
Ø      Is the Sequential addition of components followed?                                 Yes/No
Ø      Is functioning of equipment proper?                                                            Yes/No
Ø      Is BMR/BPR reviewed and found OK?                                                       Yes/No
Ø      Review & comparison of Party COA of Raw Materials.                           Yes/No
Conclusion
v     System Failure / Analyst Failure / Sampling Failure / In-process Failure / Material Failure. (According to the above conclusion initiate the OOS Phase II as per flow chart.)
Remark:

QC In charge (Name/ Signature/ Date) _______________________________________

Authorized By: QA In Charge (Name/Sign/Date) _______________________________

OUT OF SPECIFICATION PHASE II FORM


Material/Product:                                                                               Date of Initiation:
Process/Stage:                                                                                 Date of Sampling:
Lot/Batch No.:                                                                                    OOS Number:
Lot/Batch size:                                                                                   Manufacturer’s Name:

Nature of OOS
System Failure /Analyst Failure / Sampling Failure
In process Failure / Material Failure
Reason /Remark


Action Suggested
As per Flow Chart
Retest By II System / Retest By II & III Analyst
Re-sampling (In case of In process Samples)
Observations If any

Results of Above Action Suggested
The Material / Product: can be released / can not be released
Attachments: II COA + work-sheets

Any preventive / Further action suggested: -

Sign/ Date                                                                              Sign/Date
QC in charge                                                                 QA In charge


FINAL REJECTION NOTE

Format No.:

Material/Product:                                                                               Date of Initiation
Process/Stage:                                                                                 Date of Sampling :
Lot/Batch No.:                                                                                    OOS Number
Lot/Batch size:                                                                                   Manufacturer’s Name:

To: Purchase Department / Plant Manager                                               DATE:
H.O. Mumbai
From: QA Site
Please note that the following item is finally rejected:
Details:
  1. Item Code:
  2. Used For:
  3. Item Name:
  4. Date of Receipt/Manufacturing
  5. Control No./Batch No.:
  6. Quantity Received:
  7. Quantity Rejected:
  8. Supplier’s Consignment No.:
  9. Supplier’s Name:
  10. Ref. Specification:
REASON FOR REJECTION:
Further Action Plan:
QA In charge
Enclosure:
Party COA, and Samples
Cc To: Corporate QA, Supplier through Purchase Department