1.0        Purpose    : To provide a documented procedure for Procedure For Restart The Activities After Power Failure / Breakdown.            
2.0        Objective  : Procedure For Restart The Activities After  Power Failure / Breakdown.         
3.0 Scope    : This SOP is applicable for. Restart The Activities After Power Failure / Breakdown.
4.0    Responsibility  :
·        Primary: Technician Engineering
·        Secondary: Manager Engineering
5.0   Procedure :
·         Power failure:
Ø      Check the main power circuit panel for voltage and break down.
Ø      Start the D.G. Set and check the voltage and frequency, it should be 430 V and 50 HZ.
Ø      Then changeover the power supply from G.E.B. to D.G. Set for normal operation.
Ø      After resuming the power supply from G.E.B. check the voltage and frequency.
Ø      Before changing over power supply from D.G. Set power supply inform the critical
Ø      Processing areas personnel and switch. the power supply for normal working.
·          BREAKDOWN :
Ø      In case of breakdown of power supply, confirm the nature of breakdown.
Ø      Start the D.G. Set
Ø      Check the voltage and frequency; it should be 430 V & 50 HZ.
Ø      Change over the power supply from G.E.B. to D.G. Set for normal working.
Ø      After attending the breakdown of power supply, restore the power supply and check   the voltage and frequency of mains.
Ø      Before change over the power supply from D.G. Set to G.E.B. power supply inform to critical activities area personnel for normal working.